Haldane Fabrication had grown from a family workshop to a £12m operation in six years. Growth masked a problem: gross margin had dropped from 38% to 21% because quoting was done by gut feel, and the estimating team had no feedback loop from the shop floor.
We embedded a two-person team on site for the first three weeks. They shadowed estimators, production managers, and the finance controller. The root cause was not pricing skill. It was data flow. Shop-floor hours were recorded on paper timesheets that reached finance 11 days after job completion. By then, the next quote had already gone out using the same flawed assumptions.
We introduced a tablet-based time capture system (off-the-shelf, £4,200 annual licence) and rebuilt the quoting spreadsheet to pull actual hours from completed jobs. Within six weeks, estimators could see real cost data before sending a quote. Gross margin climbed back to 31% by week 14.
The engagement cost Haldane £38,000. The margin recovery added roughly £1.1m in annual profit at the same revenue level.